Project Details
This project involved comprehensive remediation and structural restoration on the Main Museum Floor (Area #1) to correct a storm drain pipe pitch and remove hazardous soil. All work was performed by licensed mold assessment, remediation, and general contractors. To meet a compressed timeline, the project was completed in just two weeks by utilizing double shifts. The initial phase included removing the flooring and safely storing glass door hardware, while concurrently repairing a sagging ceiling and installing new drywall. To ensure safety, the site was enclosed in an EPA-compliant plywood containment system with an isolation ante-room. Air quality was managed 24/7 using HEPA scrubbers and dehumidifiers.

The core work involved saw-cutting a 4-foot by 70-foot concrete section and excavating contaminated soil to a depth of 2 feet. The waste was manually transported to hazardous containers at the loading dock. Following excavation, the contractor installed a new three-pipe system pitched toward the ejector pumps. The area was backfilled with RCA, reinforced with 1/2-inch rebar, and finished with 6 inches of 5,000 psi concrete. After re-installing the glass doors and dismantling the containment, the concrete cured for 30 days under Masonite protection. Finally, the original vinyl and supplied carpet were permanently installed.
Services Provided
Demolition, Construction, Plumbing
GUAMAN FRAGOSO GROUP
visit GFG
crossmenu